
TRENCHLESSREHABILITATIONFOR INFRASTRUCTURE
Commercial and municipal Cured-in-Place Pipe (CIPP) lining, point repair, and sectional rehabilitation. Zero excavation. Minimal disruption. Structural restoration with a 50+ year design life.
50+
Year Design Life
0
Excavation Required
6"-36"
Diameter Range
Cured-in-place pipe lining for mainline sanitary and storm sewer rehabilitation. Resin-saturated liners installed through existing access points create a fully structural new pipe within the host — no excavation, no surface restoration, and a design life exceeding 50 years.
Commercial & municipal trenchless rehabilitation
Iowa and the Central Midwest — CIPP lining, point repair, and sectional rehabilitation for sanitary and storm sewer infrastructure, delivered without excavation, with full documentation for asset management and capital reporting.
CIT Sewer Solutions performs commercial and municipal trenchless pipe rehabilitation across Iowa and the Central Midwest, from targeted point repairs addressing isolated defects through comprehensive Cured-in-Place Pipe (CIPP) lining programs restoring entire collection system segments. Field crews pair inspection-driven assessment with controlled liner installation — UV cure, steam cure, or ambient methods matched to the structural requirements of each segment — so engineers receive verified, documented results with a design life exceeding 50 years. Rehabilitation decisions are grounded in CCTV condition data, not assumptions, connecting assessment findings directly to the trenchless strategy that delivers the most value for the asset and the budget.
Trenchless rehabilitation programs are typically paired with inspection, cleaning, and reinstatement services so the entire scope — from condition assessment through verified closeout — is executed under a single program without handoff gaps.
- CCTV sewer inspectionPre-rehabilitation assessment and post-install verification.
- High-pressure jettingPipe cleaning and preparation ahead of CIPP installation.
- Robotic cuttingLateral reinstatement and precision internal operations.
- Cross bore preventionPre- and post-drill cross bore verification, legacy audits, and liability-grade documentation coordinated with gas utilities.
For procurement context and lifecycle framing, use the municipal hub or contact operations to scope deliverables, documentation formats, and phasing options.
Decision-Driven Rehabilitation
Each trenchless project begins with an inspection-informed decision. These scenarios illustrate how condition findings drive rehabilitation strategy — from targeted point repair to comprehensive lining programs.
Trenchless Decision Framework
A structured reference for understanding when trenchless methods apply, how point repair differs from broader rehabilitation, and what preparation and verification the work requires.
When Trenchless Fits
Conditions and decision factors that favor trenchless rehabilitation over excavation

Rehabilitation Workflow
A systematic 7-step process from condition assessment through verified closeout. Each step is documented, each transition is deliberate, and every deliverable is structured for engineering confidence. Click any step for technical details. Click any step for technical details.
What You Receive
Every rehabilitation project includes a complete documentation package structured for engineering review, asset management import, capital reporting, and long-term warranty support.
Project Closeout Report
PDFComprehensive rehabilitation summary including segment-by-segment installation records, cure data, and rehabilitation verification — structured for capital reporting and asset management.
Pre/Post CCTV Video
MP4Full HD video recordings of every segment before and after rehabilitation, providing verifiable condition comparison and documentation of completed work quality.
Cure Data & QA Records
PDF / CSVTemperature, pressure, and cure progression logs for every installed liner — providing engineering-grade evidence that each installation met specification requirements.
Reinstatement Documentation
PDF / VideoConnection-by-connection reinstatement records with verification video, confirming that every active lateral was reopened and flow-confirmed after lining.
Warranty & Certifications
PDFMaterial warranty documentation, manufacturer certifications, and installation records supporting long-term asset management and warranty claims.
Sample Closeout Package
Request a sample deliverables package to see exactly what your team will receive after project completion.
Custom Format Support
All deliverables can be structured to match your asset management platform requirements. We support integration with ESRI ArcGIS, Cityworks, Lucity, Cartegraph, and other municipal infrastructure management systems. Contact us to discuss your specific format and handoff needs.
Request a Rehabilitation Scope Review
Whether you need targeted point repairs, a phased rehabilitation program, or a comprehensive trenchless strategy, our team is ready to review your scope and develop an approach matched to your infrastructure and budget.
Emergency rehabilitation services available. For urgent infrastructure failures, call our operations team directly.
Common Questions About Trenchless CIPP
Answers to the questions engineers, asset managers, and public works directors ask most about cured-in-place pipe rehabilitation.